新聞剪輯
Media contact
IEI Integration Corp.
TEL: +886-2-8691-6798
+886-2-2690-2098
FAX: +886-2-6616-0028
IEI Technology USA
TEL: +1-909-595-2819
FAX: +1-909-595-2816
IEI Integration China
TEL: +86-21-3462-7799
FAX: +86-021-3462-7797
IEI Integration Corp. 東京支店
TEL: +81-3-5901-9735
FAX: +81-3-5901-9736
IEI Launches S19A-QM87 Marine Panel PC and SBOX-100 Maritime Embedded System

TANK-6000-C226

Features
Intel® Core™ i5 High Performance Computing Power in a Fanless Design
3 independent displays: HDMI, DVI, and VGA
Multiple Isolated Ports for Comprehensive Protection against Electrical Surges
IEI Remote Intelligent Management System
ECDIS Implementation Schedule
Dynamic Position System (DPS)
Electronic Chart Display and Information System (ECDIS)
Specifications Dimensions Ordering information Options Packing list

   S19A-QM87 Features
 
19” and 24” Fanless Panel PC with 4th Generation Intel® Core™ i5 Dual-core Processor
-15°C ~ +55°C Wide Temperature and IP66 Protection with Flat-bezel Projected Capacitive Touchscreen
Excellent Visual Performance
  • Three independent displays • Full OSD function configuration
  • 0%~100% full range dimming • 178°/178° wide viewing angles
  • Optical bonding improves visibility under bright light (optional)
Isolation Protection
  • RS-232/422/485 isolated serial ports
  • Isolated 18V ~ 36V DC input
• 2 x Isolated CAN-bus 2.0B
iRIS Remote Management Module

   SBOX-100-QM87 Features
 
Fanless marine computer with 4th Generation Intel® Core™ i5 dual-core processor
-15°C ~ +55°C wide temperature
Isolation protection
  • 4 x RS-232/422/485 isolated serial ports
  • Isolated 18 V~36 V DC input
  • 2 x Isolated CAN-bus 2.0B
2 x 2.5" SSD bay with RAID 0/1 function
Supports IEI iRIS-2400 (IPMI 2.0 compliant)

 

   Intel® Core™ i5 High Performance Computing Power in a Fanless Design
 
 
IEI’s high performance marine solutions are built with the powerful Intel® Core™ i5 CPU within a fanless system architecture. No matter your applications are general marine system management, monitoring or conning systems, radar systems, or ECDIS navigation, IEI’s marine computers will give you the most stability than ever.
The three simultaneously independent displays are supported via the on-board video output combinations of VGA, DVI and HDMI. This versatile combination of display output options makes the marine system ideal for multi-monitor required applications in the bridge room.

• Improved CPU performance with Intel® 22nm 4th Generation Mobile Core™ i5-4400E 2.7 GHz processor
• Two 204-pin 1600/1333MHz dual-channel DDR3 SDRAM support up to 16 GB
 

   3 independent displays: HDMI, DVI, and VGA
 
 
The three simultaneously independent displays are supported via the on-board video output combinations of VGA, DVI and HDMI. This versatile combination of display output options makes the marine system ideal for multi-monitor required applications in the bridge room.



   Multiple Isolated Ports for Comprehensive Protection against Electrical Surges
 
 
Ground loop and electric surges are common in the marine applications of electronic products due to the dense placement of devices. These stray electrical signals can cause equipment damage or malfunction.
■ 2.5 kV isolation protection on the RS-232/422/485
IEI marine computer is protected from any stray electrical signals from other devices on the ship. Electric surges that were generated from other electronic devices which often passed through serial lines to the marine computer can cause severe damage and malfunction to the computers.
 
■ Isolated 18 V~36 V DC power 2250 V DC Input to Output Basic Insulation
 
■ Two independent CAN 2.0B channels with 2.5 kV isolation protection
CAN 2.0B is a kind of marine electronic data network for communication between marine electronic devices such as chart plotters, navigation instruments,  GPS receivers, etc.
 
 


   IEI Remote Intelligent Management System
 
 
The marine computer supports IEI iRIS remote management solution which helps users to manage multiple devices through single management interface and elevates work efficiency. The iRIS solution only requires a module and Internet connection!
iRIS Key Feature Detailed Functions
System health monitor • Hardware monitor
• Health log
• Event log
Remote system
maintenance
• Remote BIOS update
• Remote OS recovery
• Remote KVM + One Key Recovery
• Remote out-off-band backup
Active alert & notice • Send instant system alerts via e-mail
• Send instant system alerts via SMS
• Send instant system alerts to management server
Remote device control • Fan control
• Remote KVM
• Remote setting BIOS
Screen record • Remote video streaming record
• Event Trigger Setting & video record
Remote power control • Reset Power
• Power Off Server ─ Immediately
• Power Off Server ─ Orderly
• Power On Server
• Power Cycle Server
Remote troubleshooting • Remote software update
• Remote OS installation & recovery
• Remote KVM
• Post code display
Diagnose before dispatch • Health log analysis
• Event log analysis
Group control • Group control


   ECDIS Implementation Schedule
 
 
The International Maritime Organization (IMO) has announced that Electronic Chart Display and Information System (ECDIS) should be implemented into all the vessels by July 2018. Both new ships and existing ships should follow this regulation according to the timetable. The bridge systems are complicated and usually composed of multiple sub-systems. ECDIS clearly defines and regulates all the devices and connections, which include data collection, data communication and color calibration. Therefore, this is a huge opportunity for SI and hardware anufacturers.
 

   Dynamic Position System (DPS)
 
 
Dynamic Positioning System (DPS) is a closed-loop control system. It is driven by the control system of the ship to counteract the environmental forces to the ship, such as wind, waves and ocean currents. This mechanism could make ship remain in the position on the sea. DPS precisely calculates the propellant force by continuously monitoring the ship position deviation and analyzing the natural forces which could affect ship’s navigation direction. This process could make the ship remain in the correct position and maintain the right direction.

DPS is commonly used at various marine applications, such as subsea engineering work, underwater salvage, marine resources survey, marine engineering lifting, marine engineering umbilical laying, deep diving support, underwater engineering operations and marine engineering comprehensive test. DPS consists of measurement systems, control systems, power systems and propulsion systems, and other components. DPS possesses many functions which include maintaining the specified location, targeting, automatic searching for the best bow position,
turning point tracking, ROV automatic tracking, changing the center of rotation, automatic navigation, parallel movement and other functions.

   Electronic Chart Display and Information System (ECDIS)
 
 
The bridge system usually needs to collect and analyze many observation data, including anemometer stations, speed logs, weather stations and GPS signal. In order to precisely observe the changing walruses, the sensors are usually located at the top of ship or in the open deck. Therefore, with the long distance communication, these signals and communication paths should all follow specific regulation such as NEMA 0813. There are large amounts of data received at bridge, and they should be carefully processed and precisely analyzed. A powerful and reliable embedded box or panel PC is necessary for this task. IEI marine embedded box, the SBOX series, equips up to six COM ports which can be used to synchronously handle a large amount of data. The system of ship bridge consists of many sub-systems, which includes navigation system, path control system, radar system, etc. Most of them usually have dual system in order to prevent the failure of primary system. Additionally, dual system could also appear the identical information such as sea chart to the captain and pilot simultaneously. In practical application, dual or more LAN ports are necessary for connecting and controlling multiple monitors. The SBOX series and the S24A/ S19A series contain six ports and two LAN ports to fulfill the requirements mentioned above.
 

   S19A-QM87 Specifications
 
Model Name S19A-QM87
LCD LCD Size 19”
Panel Type PMVA
Max Resolution 1280 x 1024 (5:4)
Contrast Ratio 2000 : 1
Brightness (cd/m²) 300
LCD Color 16.7M
Pixel Pitch (mm) 294 x 294
Viewing Angle (H-V) 178° / 178°
Backlight MTBF (Hrs) 50000
Touchscreen & Controller EXC7920 (10-point), 6H
System SBC Model SMB-QM87-R10
Chipset Intel® QM87
CPU Intel® 22nm 4th generation Mobile Core™ i5-4400E 2.7GHz processor
RAM 4GB 1600MHz DDR3 SDRAM (2GB*2)
Two 204-pin 1600/1333 MHz dual-channel DDR3 SDRAM support up to 16GB
Input Interfaces I/O Ports & Switch 2 x USB 2.0
2 x USB 3.0
1 x VGA
1 x DVI-D
1 x HDMI
1 x Mic-in
1 x Line-out
1 x Line-in
2 x Antenna SMA hole (reserved)
1 x Isolated 18V ~ 36V DC 3-pin terminal block
1 x Power button
1 x PS2 (through Y-type cable supporting KB/MS)
2 x CAN-bus 2.0B, 3-pin terminal block (2.5 kv isolation protection)
1 x DB-9 RS-232 (non-isolated) ,
4 x DB-9 RS-232/422/485 (2.5 kv isolation protection)
2 x RJ-45 GbE LAN with teaming support (2KV isolation protection)
Expansion 2 x Full-size PCIe Mini slot, 1 x iRIS-2400 slot
(iRIS remote management module)
Ethernet Controller GbE1: Intel® I217LM with Intel® AMT 9.0 support
GbE2: Intel® I210-AT PCIe controller
Sensor Ambient light sensor (0% ~ 100%)
OSD Menu, brightness down, brightness up, LCD on/off by cap-sensor (graphics engine: Genesis STDP6038)
Storage 2 x 2.5” SSD bay with RAID 0/1 function
1 x Accessible CFast socket
LED Indicator Power (power on: green; power off: orange)/storage (red, blinking)/IPMI (blue)
Power Requirement Isolated 18V ~ 36V DC, screw-type 3-pin terminal block
Operating Temperature -15°C ~ 55°C (5°F ~ 131°F)
Storage Temperature -20°C ~ 60°C (-4°F ~ 140°F)
Humidity 5% to 95% RH
Thermal Design Fanless
Watchdog Timer Supports 1~255 sec. system reset
Certifications EMC: CE, FCC
Safety: DNV, IEC 60945 4th, IACS-E10, IEC 61174
IP rating: IP66 compliant front panel and IP22 compliant rear cover
Cut-out Dimensions (L x W) 442 mm x 373 mm
Dimensions (L x W x H) 463 mm x 394 mm x 113 mm
Net Weight (kg) 9.91
Gross Weight (kg) 13.38
Vibration and Shock IEC 60945 / DNV 2.4 compliant / IACS-E10
Power Supply (DC Input) DC Input ATX Power Supply
- P/N: 041D710-00-101-RS
- 150W power supply
- Input: 18~36V DC, 8-4A (max.)
- Output (max.): 12V @13A
Power Consumption 112W

   SBOX-100-QM87 Specifications
 
Model Name SBOX-100-QM87
Chassis Color Black
Dimensions
(WxHxD) (mm)
290 x 225 x 75
System Fan Fanless
Chassis
Construction
Extruded aluminum alloy
Motherboard CPU Intel® mobile Core™ i5-4400E (2.7 GHz, 37W)
Back